GENERAL INFORMATION
TECHNICAL INFORMATION
PUBLICATIONS
CONTACTING US
QUOTE REQUEST







THE WORLD CHAMPION RE-ROOFING SYSTEM Site Content (c) 2008 Roof Hugger, Inc.


ROOF HUGGER ENGINEERING AND TECHNICAL INFORMATION

COMPLETED TAS 125-03 PER ASTM E-1592-01
TEST RESULTS
(MORE TESTS PENDING)

  • New 24 ga. “PBR” panel over existing 26 ga. “PBR” panel on 5’ Roof Hugger sub-purlin spacing. (Link)
  • New 24 ga. “PBR” panel over existing 26 ga. “PBR” panel on 2’-6” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 2’ o.c. (Link)
  • New 24 ga. “PBR” panel over existing 26 ga. “PBR” panel on 2’-6” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 1’ o.c. (Link)
  • New 24 ga. “MBCI Super Lok” over existing 26 ga. “PBR” on 5’ Roof Hugger sub-purlin spacing. (Link)
  • New 24 ga. “MBCI Super Lok” over existing 26 ga. “PBR” on 2’6” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 2’ o.c. (Link)
  • New 24 ga. “MBCI Super Lok” over existing 26 ga. “PBR” on 2’6” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 1’ o.c. (Link)
  • New 24 ga. “JSM 200 DL 18”x 24 ga. by Architectural Building Components” over existing 26 ga. “PBR” on 5’ Roof Hugger sub-purlin spacing. (Link)
  • New 24 ga. “JSM 200 DL 18”x 24 ga. by Architectural Building Components” over existing 26 ga. “PBR” on 2’-6” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 2’ o.c. (Link)
  • New 24 ga. “JSM 200 DL 18”x 24 ga. by Architectural Building Components” over existing 26 ga. “PBR” on 1’-3” Roof Hugger sub-purlin spacing with special Roof Hugger Sub-rafter support 2’ o.c. (Link)

SPECIALITY TESTING

Positive load moment capacity and flexural stiffness enhancement realized by an existing roof system, utilizing new roof panels in combination with Roof Hugger notched sub-purlins. (Link)


Mailing Address: P.O. Box 1027, Odessa, FL 33556 Shipping Address: 144-B Whitaker Road, Lutz, FL 33549