Retrofit Do's and Do Not's: Test Failures

<< Return to Retrofit Do's and Do Not's


INDICATED TEST FAILURE

Typical HAT section failure during uplift testing with minimal loads applied.

ROOF FAILURES

"R" panel reroof (attached with HAT channels) FAILS in high winds.

Copyright 2011 Roofhugger. All Rights Reserved.
Physical Address: 142-B Whitaker Rd. Lutz, FL 33549
Mailing Address: P.O. Box 1027 Odessa, FL 33556
Email: sales@roofhugger.com

Web Design by Bug-Eyes Web